This project utilized 12 KimLift® slings to lift two top deck modules for mating with the jacket. This was the probably largest lift ever done offshore using synthetic slings! All slings made as matched sets to 0.25% length tolerance at load. The largest slings had an MBL of 5,450 MT and were 26 meters in length.

Badamyar Project <br> (December 2016)